The crew has changed ends in a reverse move thru LD Siding. The LIRR Greenport Scoot has passed AH Block Limit on its return run to Ronkonkoma. The RS 60 will switch Paraco in Riverhead and Sherwo... (more)
The crew is reassembling the train for pull-pull operational at MP 59. The trip to Riverhead for the Paraco switch will be a quick one. No waiting for the Greenport Scoot at LD Block-Limit.
"WAITING FOR THE SWITCH TO BE CLEANED" RS 60 starting off the day waiting for snow removal by LIRR Work crew. The snow is above the rail head. 18” of snow for this snow storm.